Construction

Antelope Valley 14 Freeway/State Route 138 Interchange Project Complete in Palmdale

According to the Antelope Valley Times, February 18, 2020, a Measure R Equity Grant funded project designed to reduce bottlenecks and improve traffic flow on a stretch of Antelope Valley 14 Freeway/State Route (SR) 138 in Palmdale was completed in early Feb. 2020. The project, which broke ground in October 2018, added an acceleration lane on southbound SR 14 from Technology Drive to north of Palmdale Blvd., and widened the northbound Rancho Vista Blvd. off-ramp. The project budget was $25 million, with construction and design costs at $15.2 million. It was fully designed by Caltrans, and constructed by CA Rasmussen, Inc. of Santa Clarita.

Translate »